Existing system
- Chillers
- 2 YORK units selected for replacement; COP approximately 3.0
- Chilled-water pumps
- No VFD
- Annual plant electricity
- Approximately 2,552,000 kWh/year

Manufacturing retrofit
A turnkey chiller plant modernization delivered while the Dong Nai factory remained in production.
Results
Project story
The challenge
The plant’s existing YORK chillers operated at approximately COP 3.0. Chilled-water pumps had no VFD, and the reference records approximately 2,552,000 kWh/year of chiller plant electricity use. APC had to replace two YORK chillers without interrupting production.
Our solution
APC supplied a 520 RT SMARDT oil-free magnetic-bearing chiller with four compressors, iCPECS control of the chilled-water pumps, condenser-water pumps and cooling towers, pump VFDs, piping and field instruments.
The result
The reference reports approximately 3,100 kWh/day and 1,131,500 kWh/year of energy savings, with roughly 50% chiller savings against the previous system. Maintenance costs were reduced and selected removed components were retained as spares.
Before & after
Scope of supply
18 Oct – 20 Dec 2015
Key equipment
520 RT, approximately 1,828 kWr; 4 compressors
View equipmentChilled-water pumps, condenser-water pumps and cooling towers
Piping, power connections and measurement points
Commissioning data
The following part-load ranges describe this installation’s commissioning tests. They are not rated performance guarantees for other projects.
| Load | Capacity (kWr) | Input (kWe) | COP |
|---|---|---|---|
| 59–63% load | 920–995 | 120–133 | 7.4–8.0 |
| 43–45% load | 680–717 | 74–79 | 8.7–9.6 |
Gallery
Project photographs published by APC. Read the original reference for the installation scope and operating context.
Enlarge photograph
Enlarge photograph
Enlarge photograph
Enlarge photograph
Enlarge photograph
Enlarge photograph
Enlarge photograph
Enlarge photographReferences & downloads
Turnkey project