Equatorial Hotel

Hospitality retrofit

Equatorial Hotel

A chiller plant retrofit combining SMARDT oil-free equipment with CPECS controls for an operating hotel.

Client
Equatorial Hotel
Location
Ho Chi Minh City
Retrofit period
Available on request
Chiller capacity
450 RT
Scope
Chiller + CPECS

Results

The outcomes in context.

Replacement chiller
450 RT
Original saving target
30%
First four months: consumption
67,830 kWh/month

Project story

From the operating brief to the handover.

The challenge

Understand what needed to change.

The existing Trane plant operated at approximately COP 4.5, with no VFD on the pumps or cooling towers, and reported annual electricity use of 2,112,000 kWh.

Our solution

Coordinate the plant as one system.

APC selected a SMARDT oil-free chiller and CPECS control of the chilled-water pumps, condenser-water pumps and cooling towers. The Cooling Division profile records a 450 RT installation.

The result

Review the documented outcome.

The reference reports approximately 67,830 kWh per month of plant electricity consumption over the first four months. The original proposal expected 30% savings; the monthly figure is consumption, not energy saved.

Before & after

What changed in the plant.

Existing system

Chiller
Trane; COP approximately 4.5
Plant controls
Pumps and cooling towers without VFD
Annual plant electricity
2,112,000 kWh/year

APC solution

Chiller
SMARDT oil-free, 450 RT
Plant controls
CPECS for pumps and cooling towers
First four months
Approximately 67,830 kWh/month consumption

Scope of supply

A clear delivery scope.

  • SMARDT oil-free chiller replacement
  • CPECS integration for chilled-water pumps
  • Condenser-water pump and cooling tower controls

Key equipment

The equipment behind the scope.

CPECS controls

Chiller plant, pump and cooling tower coordination

Turnkey project